Current topics

Helen continues investing in solar energy production by acquiring turn-key solar power plant in Uusikaupunki

Helen is acquiring a -turn-key 206 MWp solar power plant located in Kalanti, Uusikaupunki, in south-west Finland. The solar power plant was sold and will be subsequently constructed by the

22.12.2022

Helen’s public EV charging network expands – high-power charging stations operating on wind power to be available at Puuilo stores

In future, charging of electric vehicles can be done easily while doing your shopping when Helen opens new charging stations in connection with outlets of the Puuilo department store chain. Rapid

22.12.2022

Heat production started in Vuosaari bioenergy heating plant – adaptable hybrid plant offers top-class energy efficiency

Heat production in the Vuosaari bioenergy heating plant has started on schedule in the heating period 2022–2023. The plant has produced heat from biomass into the district heating network since 9

20.12.2022

Helen and LämpöYkkönen launch Geonova Oy, a company focusing on geothermal heat and heat pump solutions

Helen Ltd and LämpöYkkönen Oy have established Geonova Oy, a company that focuses on geothermal heat and heat pump solutions. Geonova brings a fast-growing life cycle model to the energy market that

16.12.2022

Carbon neutral energy company 2030 – 80% reduction in emissions possible already in 2025

Helen’s target is to be a carbon neutral company by 2030. In our carbon neutrality programme, we report on the actions and the emissions reduction path that will take us to our target, reduce our

14.12.2022

Wind power is a fundamental pillar of a sustainable energy system

2022 has been a triumphant year for wind power at Helen. The 20 wind turbines at our Lakiakangas 3 wind farm started regular electricity production in April and the seven turbines in Juurakko in

08.12.2022

Helen's first hydrogen plant is designed by Sweco

Helen has chosen Sweco for conducting the basic engineering of the 3H2 – Helsinki Hydrogen Hub in Vuosaari. With this hydrogen production pilot project, Helen aims to create the necessary capabilities

30.11.2022

Helen accelerates wind power investments – New wind farm to Eastern Finland

Helen has agreed together with Ålandsbanken Wind Power Fund and OX2 on the construction of a 145 MW wind farm in Pieksämäki. A total of 22 wind turbines will be built in the Niinimäki wind farm which,

28.11.2022

Helen and Fortum are looking into potential SMR cooperation

Helen and Fortum are investigating the possibilities of cooperation in nuclear power, especially in terms of small modular reactors (SMR). Both companies have already previously expressed their

25.11.2022

Helen receives official approval from the Science Based Targets initiative for its emissions reduction targets

Helen is the first energy Finnish company to receive official approval from the Science Based Targets initiative (SBTi) for its emissions reduction targets. The new targets are based on the Paris

17.11.2022

See also


Open data