Heat for businesses and properties

Prices

It is possible to join the district heating network if the property in question is located mainly along a district heating network in Helsinki. See the prices and request a quote.

Energy price

Previous price

1.5. - 30.9.

27,78 €/MWh

Summer period

Current price

1.10. - 31.12.

46,58 €/MWh

Autumn period

Contact us

Future price

1.1. - 28.2.

Reported on 1.12.

Winter period

Prices are excluding VAT 24%.

New price period for district heat begins and water flow fee will rise as from 1 October 2017. Read the news release for more information.

Further information about the pricing of district heat.

Operating costs

 District heat 2
terraced houses, apartment blocks
(contracted water flow 0.01–2 m3/h)
District heat 10
apartment blocks and commercial properties, shopping centres
(contracted water flow 2.01–10 m3/h)
District heat 100
commercial properties,
shopping centres (contracted water flow 10.1–100.0 m3/h)
Energy fee (average price for 2016) 40,36 €/MWh 40,36 €/MWh  40,36 €/MWh
Water flow (m3/h) 1000 - 5000 € 5000 - 16000 € 16000 - 82000 €

Connecting to the network

 District heat 2
terraced houses, apartment blocks
(contracted water flow 0.01–2 m3/h)
District heat 10
apartment blocks and commercial properties, shopping centres
(contracted water flow 2.01–10 m3/h)
District heat 100
commercial properties,
shopping centres (contracted water flow 10.1–100.0 m3/h)
Basic charge 2200 € 6270 € 17320 €
Water flow fee m3/h 4510 € 2475 € 1370 €
Line charge (m) 75 € 84 € 89 €

Terms of contract

  • Housing co-operative in Jätkäsaari

    Kaukolämpö on fiksu valinta

    District heat is the smartest choice in Helsinki.  An apartment block of 28,000 cubic metres, consisting of 90 apartments, was built in Jätkäsaari. Its connection fee without excavation work was approximately EUR 18,400. With heat consumption of 800 MWh, the annual heating cost of the apartment block is about EUR 39,600. This includes the price of heating energy, around EUR 31,600, and the water flow fee of about EUR 8,000.

    Total costone-off connection fee €18,400 + €39,600/year

District heat terms of contract